Nucor Public Affairs Update
|
|
The Section 232 steel tariffs implemented by the Trump Administration in March 2018 continue to have a beneficial impact on the U.S. steel industry. Nucor is working diligently to ensure that the Section 232 measures remain as robust and effective as possible.
Read Here |
|
BEEM Construction Builds Water Treatment Plant
|
|
The city of Saint Marys, Ohio chose a custom pre-engineered metal building for their new 16,328 square-foot water treatment plant. It features multiple symmetrical gable and lean-to buildings tied-in with high-low conditions, and inside the facility is a 42’ by 55’ top running crane.
Read Here |
|
Improvement to Walk Doors Announced
|
|
We are pleased to announce an improvement to our standard walk door package which will now include, at no additional charge, a powder coated finish on its door leaf and frame. This upgrade will provide a much more durable and consistent finish and will extend the life span of your walk doors in the field.
Read Here |
|
Kirby Congratulates MCN’s Top Metal Builders
|
|
Congratulations to our Kirby Builders who made the Metal Construction News’ Top Metal Builder list. We’re proud of our partnerships and the expertise of our Builders.
Read Here |
|
Multiple Buildings in eQuote: Become Familiar with the Building Manager
|
|
Our Tips From eQuote series is designed to highlight new and existing features, and tips and tricks within the software program of which you may or may not already be aware. This month’s tip explains working with multiple buildings in the building manager in eQuote.
Read Here |
|
We Want Your Building Photos!
|
|
The Calendar Program is designed to recognize outstanding facilities constructed with Kirby Building Systems’ products. Also, back by popular demand, with each submitted project you will be entered into a random drawing for a change to win a YETI Tundra 65 cooler. Submit today!
Submit Here |
|
Sharing the Load with Tandem Lift Cranes
|
|
A Tandem Lift is when two or more cranes pick up the same object at the same time. By identifying a Tandem Lift scenario at the quote stage, you can ensure that your building is adequately designed for the correct cranes and avoid delays for your project.
Read Here |
|
New Assembly for R-Boost Now Available
|
|
We are pleased to announce an improvement to our R-Boost™ Elevated Insulation System. In an effort to improve thermal performance capabilities of the R-Boost system, a NEW R25+R38 assembly has been developed and is available immediately.
Read Here |
|